{"id":9767,"date":"2017-03-15T08:34:00","date_gmt":"2017-03-15T08:34:00","guid":{"rendered":"https:\/\/www.kraftcuring.com\/?p=9767"},"modified":"2020-06-18T09:02:39","modified_gmt":"2020-06-18T09:02:39","slug":"accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel","status":"publish","type":"post","link":"https:\/\/www.kraftcuring.com\/ru\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/","title":{"rendered":"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel"},"content":{"rendered":"\n<p>For the Stuttgart-Ulm railway project a new high-speed section is being built from Wendlingen (Neckar) to Ulm alongside the A8 motorway. The new section will offer a fast and convenient way to get over the Swabian Alb. Regional, national and international travel times will be significantly reduced. The Baden-W\u00fcrttemberg region will be permanently incorporated into the European high-speed network. The section includes the approximately 8 km-long Albvorland Tunnel between Wendlingen and Kircheim unter Teck. The production of the precast concrete tunnel liner segments required for the construction of the tunnel, are cured with a system that is designed, supplied and serviced by Kraft Curing Systems<\/p>\n\n\n\n<p><a href=\"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/2017-03_Albvorland_Tunnel_Herrenknecht_EN.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">&#8230;. read more (PDF, 1.6 MB)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the Stuttgart-Ulm railway project a new high-speed section is being built from Wendlingen (Neckar) to Ulm alongside the A8 motorway. The new section will offer a fast and convenient&#8230;<\/p>\n","protected":false},"author":1,"featured_media":9775,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[63],"tags":[285,286,283,284],"class_list":["post-9767","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-accelerated-curing","tag-albvorlandtunnel","tag-tunnel","tag-tunnel-segment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel - KraftCuring<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel - KraftCuring\" \/>\n<meta property=\"og:description\" content=\"For the Stuttgart-Ulm railway project a new high-speed section is being built from Wendlingen (Neckar) to Ulm alongside the A8 motorway. The new section will offer a fast and convenient...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"KraftCuring\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-15T08:34:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-06-18T09:02:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/albvorlandtunnel-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 \u043c\u0438\u043d\u0443\u0442\u0430\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel - KraftCuring","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/","og_locale":"ru_RU","og_type":"article","og_title":"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel - KraftCuring","og_description":"For the Stuttgart-Ulm railway project a new high-speed section is being built from Wendlingen (Neckar) to Ulm alongside the A8 motorway. The new section will offer a fast and convenient...","og_url":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/","og_site_name":"KraftCuring","article_published_time":"2017-03-15T08:34:00+00:00","article_modified_time":"2020-06-18T09:02:39+00:00","og_image":[{"width":1200,"height":563,"url":"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/albvorlandtunnel-1.png","type":"image\/png"}],"author":"Admin","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c":"Admin","\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"1 \u043c\u0438\u043d\u0443\u0442\u0430"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/","url":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/","name":"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel - KraftCuring","isPartOf":{"@id":"https:\/\/www.kraftcuring.com\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/#primaryimage"},"image":{"@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/albvorlandtunnel-1.png","datePublished":"2017-03-15T08:34:00+00:00","dateModified":"2020-06-18T09:02:39+00:00","author":{"@id":"https:\/\/www.kraftcuring.com\/de\/#\/schema\/person\/2813b67fe855b7d1cb0b2d667734b74f"},"breadcrumb":{"@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/"]}]},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/#primaryimage","url":"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/albvorlandtunnel-1.png","contentUrl":"https:\/\/www.kraftcuring.com\/wp-content\/uploads\/2020\/06\/albvorlandtunnel-1.png","width":1200,"height":563,"caption":"Albvorlandtunnel"},{"@type":"BreadcrumbList","@id":"https:\/\/www.kraftcuring.com\/accelerated-concrete-tunnel-segment-curing-for-the-albvorland-tunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.kraftcuring.com\/ru\/"},{"@type":"ListItem","position":2,"name":"Accelerated Concrete Tunnel Segment Curing for the Albvorland Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/www.kraftcuring.com\/de\/#website","url":"https:\/\/www.kraftcuring.com\/de\/","name":"KraftCuring","description":"Innovative concrete curing systems. Made in Germany. Higher Early Strength - better concrete quality - lower production costs - world wide service 24\/7","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.kraftcuring.com\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Person","@id":"https:\/\/www.kraftcuring.com\/de\/#\/schema\/person\/2813b67fe855b7d1cb0b2d667734b74f","name":"Admin","url":"https:\/\/www.kraftcuring.com\/ru\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/posts\/9767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/comments?post=9767"}],"version-history":[{"count":1,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/posts\/9767\/revisions"}],"predecessor-version":[{"id":9789,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/posts\/9767\/revisions\/9789"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/media\/9775"}],"wp:attachment":[{"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/media?parent=9767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/categories?post=9767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kraftcuring.com\/ru\/wp-json\/wp\/v2\/tags?post=9767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}